Success Stories
![](https://www.mecano.co/storage/2022/01/Tunel-de-Oriente-Antioquia-min-1024x620.png)
Project:
Oriente Tunnel – Antioquia
Client:
EDEMSA
Sector:
Infrastructure
Location:
Antioquia – Colombia (82 KM Installed).
![](https://www.mecano.co/storage/2021/12/Tunel-de-Sumapaz-Bogota-Girardot-100-1024x737.jpg)
Project:
Sumapaz Tunnel Bogota – Girardot
Client:
Bogotá – Girardot Highway Concession
Sector:
Infrastructure
Location:
Autopista Girardot – Bogotá – Colombia
(23 KM Intalados)
![](https://www.mecano.co/storage/2022/01/Ampliacion-Canal-de-Panama-1024x576.jpg)
Project:
Panama Canal Expansion
Client:
Paige Electric – Pistar
Sector:
Infrastructure
Location:
Panama City, Panama (13 KM Installed).
![](https://www.mecano.co/storage/2021/12/Planta-de-Tratamiento-de-Agua-Residuales-PTAR-Bello-100-1024x737.jpg)
Project:
PTAR Bello Wastewater Treatment Plant
Client:
Schrader Camargo – EPM
Sector:
Infrastructure
Location:
Bello, Antioquia – Colombia (3.5 KM Installed).
![](https://www.mecano.co/storage/2022/01/Sociedad-Portuaria-Puerto-Bahia-1024x576.jpg)
Project:
Sociedad Portuaria – Puerto Bahía
Client:
ITT Consortium / Pacific Rubiales
Sector:
Infrastructure
Location:
Valle del Cauca – Colombia (5 KM Installed).
![](https://www.mecano.co/storage/2021/12/Planta-Cogeneradora-Aconcagua-100-1024x737.jpg)
Project:
Aconcagua Cogeneration Plant
Client:
Duro Felguera / ENAP
Sector:
Infrastructure
Location:
Concón – Chile (6 KM Installed).
![](https://www.mecano.co/storage/2021/12/Planta-Cogeneracion-RioPaila-100-1024x737.jpg)
Project:
RioPaila Cogeneration Plant
Client:
Requip / Power Consortium
Sector:
Infrastructure
Location:
Valle del Cauca – Colombia (5 KM Installed).
![](https://www.mecano.co/storage/2022/01/Hidroelectrica_5_de_Noviembre-1024x683.jpg)
Project:
5 de Noviembre Hydroelectric Power Plant
Client:
CSH Commercial
Sector:
Infrastructure – Energy
Location:
El Salvador (3.7 KM Installed).
![](https://www.mecano.co/storage/2021/12/Hidroelectrica-Chucas-100-1024x737.jpg)
Project:
Chuchás Hydroelectric Plant
Client:
NICSA – GEA Group
Sector:
Infrastructure – Energy
Location:
Costa Rica (2 KM Installed)
![](https://www.mecano.co/storage/2021/12/Celsia-Bolivar-Granja-Solar-100-1024x737.jpg)
Project:
Celsia Bolivar Solar Farm
Client:
Solarpack – Celsia
Sector:
Infrastructure – Energy
Location: Santa Rosa de Lima, Bolívar – Colombia
(1.5 KM Installed)
![](https://www.mecano.co/storage/2021/12/Proyecto-Pelicano-OASIS-Granja-Solar-100-1024x737.jpg)
Project:
Proyecto Pelícano – OASIS Solar Farm Tracker
Client:
Sunpower
Sector:
Renewables / Energy
Location:
Santiago de Chile – Chile (44 KM Installed).
![](https://www.mecano.co/storage/2021/12/Central-Termoelectrica-Punta-Catalina-100-1024x737.jpg)
Project: Punta Catalina Thermoelectric Power Plant (Caldera,
de-aerator, auxiliary equipment and piping)
Client:
Schrader Camargo / Odebrecht / Anixter
Sector:
Energy
Location: Dominican Republic (3 KM Installed)